Andhra Pradesh Power Generation Corporation Limited (APGENCO)
Andhra Pradesh Power Generation Corporation Limited (APGENCO) is the electricity generation company of the Government of Andhra Pradeshstate in India. [2] It has an installed capacity of 7048.4 MW which makes it the third largest power generation company in India.[3] Andhra Pradesh Power Generation Corporation Limited is one of the pivotal organizations of Andhra Pradesh, engaged in the business of Power generation. Apart from operation & Maintenance of the power plants it has undertaken the execution of the ongoing & new power projects scheduled under capacity addition programme and is taking up renovation & modernization works of the old power stations. APGENCO came into existence on 28.12.1998 and commenced operations from 01.02.1999. This was a sequel to Governments reforms in Power Sector to unbundle the activities relating to Generation, Transmission and Distribution of Power. All the Generating Stations owned by erstwhile APSEB were transferred to the control of APGENCO.
The installed capacity of APGENCO as on September 30, 2010 is 8135.9 MW comprising 4382.50 MW Thermal, 3751.40 MW Hydro and 2 MW Wind power stations, and contributes about half the total Energy Requirement of Andhra Pradesh. APGENCO is third largest power generating utilitiy in the Country next to NTPC and Maharashtra. It's installed Hydro capacity of 3703.4 MW is the second highest among the Country.
APGENCO has an equity base of Rs.2107 crores with 11,000 dedicated employees as on 30.06.2009. The company has an asset base of approximately Rs.20100 crores.
APGENCO AE Results 2010 - 2011 :
The Andhra Pradesh Power GenerationCorporation Limited (APGENCO) has announced theAssistant Engineers (AE) Recruitment 2010 - 2011 Results. As per announcement, APGENCO Results 2010 - 2011 on the behalf of AE Recruitment in APGENCO will publish soon at the main official website (www.apgenco.gov.in) of APGENCO.
When, APGENCO will announced the Result based on Assistant Engineers (AE) Recruitment 2010 - 2011.
Remember it, APGENCO AE Results 2010 - 2011 will be declared only ONLINE at the main official website (www:apgenco.gov.in) of APGENCO.
AP GENCO SUB ENGINEERS WRITTEN EXAM SYLLABUS
(For Sub-Engineer/Electrical)
- Elements of Electrical Engineering:
- Electrical circuits:
- D.C.Machines:
- Electrical Measuring Instruments & Batteries:
- A.C.Machines:
- Power Systems:
- Electronics:
- Electrical Utilization and traction:
- General Mechanical Engineering:
- Information Technology:
- Industrial Management and Entrepreneurship
Syllabus(for Sub-Engineer/Mechanical)
- Hydraulics:
- Energy Sources and power plant Engineering:
- Industrial Management & Entrepreneurship:
- Estimating and Costing:
- Manufacturing Technology -I:
- Manufacturing Technology -II:
- Refrigeration and Air Conditioning:
- Information Technology:
Syllabus(for Sub-Engineer/Civil)
- Surveying:
- Surveying-I:
- Surveying-II:
- Surveying Practicals II:
- Quantity Surveying -I:
- Construction Materials:
- Construction Practice:
- Theory of Structures:
- Theory of Structures-I:
- Theory of Strucres-II:
- Hydraulics:
- Transportation Engineering:
- Design of RC structures:
- Information Technology:
Syllabus(for Sub-Engineer/Electronics)
- Electronic Components and Devices:
- Elements of Combinational and sequential logic circuits:
- Fundamentals of Instrumentation and Transducers:
- Basics of DC machines, AC machines and transformers
- Measuring instrumentation:
- Process instrumentation:
- Power plant instrumentation and unit operation:
- Power Electronics:
Syllabus on power plant related topics for Sub-
Engineers (except Sub-Engineer/Civil)
- Thermal Power Stations - Process
- Hydel Power Stations - Process